Clearing the land

by Carla Whitmire | Apr 13, 2012
Whitmire Grading has state-of-the-art excavators with skilled operators that handle an excavator as an extension of their hands!

Before grading can begin most trees that are in the limits of construction have to be taken down and the stumps and overburden removed. This is started after the erosion control measures are installed. 