Storm Drainage Installation
by
Carla Whitmire
| Apr 09, 2012
Storm drainage installation is in progress at the MAHEC project in Asheville, N.C. The crew is aligning the laser transit and setting the grade for the next structure in the line. After the system is installed the area will be filled to subgrade which is near the top of the concrete structures.